Perth and District Chamber of Commerce

All Candidates Meeting, Oct 8th 2026, Perth Studio Theatre

Housing

Karen and I built our first home when we were 24.

A 1250 sq ft, full brick veneer bungalow at the corner of Sunset and Inverness,

Our move-in cost was 2.5 time our household income, we had a CMHC mortgage at 75% of our construction cost. That mortgage had a 9% interest rate with a 25-year amortization and a 5-year term.

The median household income in Perth from the 2021 census was $68,000. At 2.5 times such an income, we would need to be producing that 1250 sq ft bungalows for $175,000, or for the whole of the Perth Community$215,000. So, between $140 to $170 per square foot.

So, what has happened to make homeownership advance from 2.5 times household income to 5-6 times income.

Is it $1.40 sq ft building permit fee?

Is it Development charges of $9-17,000 per housing unit/ house?

If it is, where do we/how do we assign the costs associated with Building, Planning and CBO offices be covered. Do we want property tax on all existing homes to cover that cost?

The current Building Permit and development charges in the Town of Perth are well within low-median range regionally and provincially.

So, without federal/provincial funding supports, I don’t think BP/DC costs are a significant contributor to our current challenge.

While talking about housing, I am going to take the opportunity to talk about Land Use Planning and Lanark County’s role in establishing and controlling Community Growth Management and extending rights to accommodate growth.

First, for the Perth Community, we have four official Plans, four sets of building bylaws, four planning administrations. And that is how we present at/to the County. Four municipalities.

The County goes about determining growth potential on a municipal basis not a ‘community basis’. In 2024, Watson and Associates were engaged to assist the county build a Growth Management Strategy.

Mississippi Mills, the Almonte community, goes into that study as one municipality, the Perth community goes in as four municipalities.

The results present starkly; Mississippi Mills and Carleton Place are by far the fastest growing municipalities with Perth DNE TVT LH left in the realms of discountable.

But if the Perth Community were to present, like Mississippi Mills (Almonte, Pakenham Village, Ramsey Township and Pakenham Twp.), as one municipality the Perth Community would actually be the fastest growing in Lanark County.

The Perth Community are not recognized for what we are.

The Perth Community is also negatively impacted by a tight and restrictive municipal boundary surrounding the ToP.

Anything associated with the Town operations, anything requiring municipal water and sewar servicing, must happen within that municipal boundary. At present Perth has the Blueberry creak and marsh to the north, the PSW on its west running back to the Glenn Tay side road and to the northeast by The Long Swamp between County Road 10 and Highway 7.

We a boundary locked, we are making less than ideal land use planning decisions. We should be doing land use and development planning on a Perth community basis as Mississippi Mills is so enabled.